1 new LinkedIn ad in 30 days · 2 of 3 networks checked
TILLEN - Masters in Handling Technology ads
- tillen.com
- Industrial Machinery Manufacturing
- NL
- 15 employees
TILLEN - Masters in Handling Technology’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to browse our full recording. Watch TILLEN - Masters in Handling Technology on any plan to get each new one in your feed.
Watchlist included in every plan
What TILLEN - Masters in Handling Technology runs
- Single image · LinkedIn
- 6
| Network | Status | Last 30 days | Total ads found | Ad activity | Checked | Next step |
|---|---|---|---|---|---|---|
| Ads recorded | 1 | 65+ | 11/11/2026 | View ads → | ||
| Meta | Not checked | — | — | View ads → | ||
| None recorded | — | — | 11/11/2026 | View ads → |
TILLEN - Masters in Handling Technology has 1 new LinkedIn ad in the last 30 days. We recorded no Google ads on 11 Nov 2026.
Latest ads
- LINKEDIN · IMAGESince 2 Nov 2026
𝗪𝗵𝗶𝗰𝗵 𝗹𝗶𝗳𝘁 𝗼𝗻 𝘆𝗼𝘂𝗿 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝗶𝘀 𝘀𝘁𝗶𝗹𝗹 𝘂𝗻𝘀𝗼𝗹𝘃𝗲𝗱, 𝘄𝗵𝗶𝗹𝗲 𝘁𝗵𝗲 𝗶𝗻𝘀𝘁𝗮𝗹𝗹𝗮𝘁𝗶𝗼𝗻 𝗱𝗮𝘁𝗲 𝗶𝘀 𝗮𝗹𝗿𝗲𝗮𝗱𝘆 𝗳𝗶𝘅𝗲𝗱? That is where our engineering starts. On 24 and 25 November, Tillen will be at the Offshore Energy in RAI Amsterdam at stand 1.618. Since 2007, our engineers have designed, verified and built the equipment that makes difficult lifts manageable. Offshore wind, cable handling and heavy lifting are where most of that work takes place at the moment. What you can discuss with us at the stand: 🔸 Lifting and handling tools for heavy, oversized or irregular components 🔸Cable deployment systems 🔸 Container Based Cranes for offshore, quayside and yard operations 🔸 Fall pipe systems for rock placement over subsea cables, protecting them against being dragged out by ship anchors 🔸 Structural verification and proof loading of lifting equipment Challenges welcome. Solutions delivered. See you in Amsterdam. #oeec2026 #offshoreenergy #offshorewind #liftingandhandling #engineering Ivo Van Donselaar Emile Rupert
- LINKEDIN · IMAGESince 24 Sept 2026
Live from WindEnergy Hamburg, 𝗛𝗮𝗹𝗹 𝗕𝟰_𝗘𝗚 𝟯𝟮𝟳.𝟲 Today we are showing our 𝗖𝗼𝗻𝘁𝗮𝗶𝗻𝗲𝗿 𝗕𝗮𝘀𝗲𝗱 𝗖𝗿𝗮𝗻𝗲 range. A modular lifting solution built around a 10-foot certified tool container, engineered for deployment offshore, on quaysides, and in industrial yards. Three configurations on display: 🔸 Vectus – controlled linear motion, single axis, straightforward lifting tasks 🔸 Versura – 360° rotation for 2D positioning in confined or dynamic environments 🔸 Volaris (and Volaris Forte) – full 3D motion, up to 2.5 tonnes WLL and 14 m reach All components connect via standardised twistlocks, so mobilisation is fast and structural integrity is not compromised. DNV ST certified (0378, E273, E271). If your project needs a crane that can be deployed quickly without a lengthy site setup, come and see it in person. Emile Rupert and Ivo Van Donselaar are on the stand to talk through the details. More on the full range: https://lnkd.in/e9nEetSn
- LINKEDIN · IMAGESince 24 Sept 2026
Day three at WindEnergy Hamburg, 𝗛𝗮𝗹𝗹 𝗕𝟰_𝗘𝗚 𝟯𝟮𝟳.𝟲 Today the focus is on the tooling side: rotor installation aids and cable handling systems for onshore and offshore turbine assembly. These setups are rarely off-the-shelf. Every configuration is built around the specific component, the vessel or site layout, and how your team actually works during installation. 🔸 Rotor installation aids designed for accuracy during assembly 🔸 Cable handling systems built to reduce downtime during transport and installation 🔸 Solutions engineered to fit both offshore and onshore workflows 🔸 Built with input from the engineers who use them on site If you want to see how this looks in practice rather than just hear about it, come by the stand. Emile Rupert and Ivo Van Donselaar can walk you through examples from recent projects. #windenergyhamburg #windfarmtooling #cablehandling #rotorinstallation
- LINKEDIN · IMAGESince 21 Sept 2026
𝗪𝗲 𝗮𝗿𝗲 𝗵𝗲𝗮𝗱𝗶𝗻𝗴 𝘁𝗼 𝗪𝗶𝗻𝗱𝗘𝗻𝗲𝗿𝗴𝘆 𝗛𝗮𝗺𝗯𝘂𝗿𝗴 𝘁𝗵𝗶𝘀 𝗦𝗲𝗽𝘁𝗲𝗺𝗯𝗲𝗿. If you are managing a project where the scope keeps expanding, or where a lift does not fit standard equipment, this is worth a stop. We will be at hall B4_EG 327.6 with our Container Based Crane range and our wind farm handling tooling. 🔸 Modular lifting, DNV certified 🔸 Rotor installation and cable handling systems 🔸 Transition piece lifting tools engineered for site-specific conditions On the stand this year: Emile Rupert and Ivo Van Donselaar. Time slots at the stand are limited during peak hours. If you want to talk through a specific challenge in advance, message us and we will set something up. We will be there from 22 to 25 September. Looking forward to meet you! #windenergyhamburg #offshorewind #liftingengineering
- LINKEDIN · IMAGESince 3 Sept 2026
Planned equipment no longer available. Two weeks before installation. That call comes in more often than you might expect. We stepped in. Recalculated the load cases, redesigned the rigging arrangement, and got the revised procedure ready in time. The installation went ahead as planned. But here is what that situation actually shows: a lifting plan designed around one specific crane has no room to move when circumstances change. And in offshore and civil projects, circumstances change. When we are involved early, we design for variability. Not just for the ideal scenario, but for the realistic one. That means a lifting plan that holds up when the planned crane is substituted, when the weather window shifts, or when the sequence needs to change on site. We can respond quickly when time is short. But a robust plan starts at the beginning. 🔸 tillen.com #heavylift #liftingengineering #offshoreengineering
- LINKEDIN · IMAGESince 3 Sept 2026
The verification report came back with comments. Fabrication had already started. That is an uncomfortable position. Not because the comments were unreasonable, but because most of them could have been addressed at the design stage, before any steel was cut. Verification is not a final check. It is most valuable as part of the engineering process from the start. When the calculation methodology is agreed early, when the load cases are defined before the design is fixed, and when the proof load programme is planned rather than retrofitted, the outcome is more predictable and the costs are lower. At Tillen, we work across the full process: design, calculation, fabrication drawings, and verification. That means we can ask the right questions at the right moment, not after engineering thinks they are done. We also carry out verification as third party. If you require a second, external set of eyes on your own calculations and designs before certification, that is something our team takes on separately from any design work. If your project is still in the engineering phase, that is exactly the right time to talk. #structuralengineering #verificationengineering #heavylift #projectengineering"
6 of 65+ adsSign up to see every TILLEN - Masters in Handling Technology ad, filter by format and date, and get alerts on new ones.
See all 65+ adsQuestions about TILLEN - Masters in Handling Technology’s ads
Does TILLEN - Masters in Handling Technology have new LinkedIn ads?
Yes. We found 1 new LinkedIn ad for TILLEN - Masters in Handling Technology in the 30 days to 12 Nov 2026.
How many LinkedIn ads has TILLEN - Masters in Handling Technology run?
LinkedIn’s ad library lists 65 ads for TILLEN - Masters in Handling Technology. We recorded 42 LinkedIn ads for TILLEN - Masters in Handling Technology, first recorded on 2 Oct 2026 and last recorded on 8 Nov 2026.
Does TILLEN - Masters in Handling Technology run Google ads?
We recorded no Google ads for the domain tillen.com on 11 Nov 2026.
Which ad formats does TILLEN - Masters in Handling Technology use?
The 6 LinkedIn ads on this page include 6 image ads.
Watch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.