On air · 1 of 3 networks
LIGHTYX ads
- lightyx.com
- Construction
- US
- 28 employees
LIGHTYX’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 105. Watch LIGHTYX on any plan to get each new one in your feed.
Watchlist included in every plan
What LIGHTYX runs
- Single image · LinkedIn
- 4
- Video · LinkedIn
- 2
- Google ads on 2 Nov 2026
- 14
- active Meta ads on 5 Nov 2026
- 13
- Meta placements
- 3
| Network | Status | Live ads | Nov 2025Activity · 52 weeksNov 2026 | Checked | Next step |
|---|---|---|---|---|---|
| None recorded | 0 | Checked 7 Nov 2026 | See all 105 ads → | ||
| Meta | Running | 13 | Checked 5 Nov 2026 | Collect them with the API → | |
| Recently | 14 | Ads on the Google Ads Transparency Center | Checked 2 Nov 2026 | Collect them with the API → |
LIGHTYX has no live LinkedIn ads. Its Facebook page had 13 active ads on 5 Nov 2026, and we recorded 14 Google ads on 2 Nov 2026.
Latest ads
- LINKEDIN · IMAGERecorded 25 Sept 2026
How are you doing your construction layout today? After supporting millions of square feet of layout across hundreds of projects, we’ve consistently seen teams speed up their layout 4× on average while dramatically reducing errors and rework — simply by switching to Laser Layout. Learn more: https://lnkd.in/du4XNwbS
- LINKEDIN · IMAGERecorded 25 Sept 2026
How are you doing your construction layout today? After supporting millions of square feet of layout across hundreds of projects, we’ve consistently seen teams speed up their layout 4× on average while dramatically reducing errors and rework — simply by switching to Laser Layout. Learn more:
- LINKEDIN · VIDEORecorded 25 Sept 2026
🚀 In just 2 minutes, see how LIGHTYX can save hours of construction labor. All across the U.S., construction crews are working in a new way. From hospitals to high-rises, teams walk onto the site, power up LightYX Edge, and watch their digital designs come to life—projected in full scale onto walls, floors, and ceilings. No more tape measures. No more paper drawings. No more costly rework. 👉 Crews simply follow the guided laser layout to mark and build in real time. ✅ Layout up to 80% faster ✅ 1/8″ laser accuracy to eliminate errors ✅ Built-in 3D scans for QA and documentation it’s the new standard in construction layout, and if you haven’t seen it on your project yet— 👀 take a glimpse and learn more : https://www.lightyx.com/
- LINKEDIN · VIDEORecorded 25 Sept 2026
Ready to outpace your schedule by switching from total stations to LightYX’s MEP layouts projected on the jobsite? Alpha Mechanical completed their mechanical layout several times faster using LIGHTYX’s laser-guided layout system. Hear what their team has to say about how LightYX helps project MEP layouts directly onto the jobsite with speed and accuracy. #constructiontech #totalstation #MEP #Constructionautomation
- LINKEDIN · IMAGERecorded 25 Sept 2026
Two drywall pros, just a few hours after training, already running layout with LIGHTYX on their own. That’s how intuitive it is — see it, build it. 👉 The laser projection is clear, bright, and visual, making it easy for crews to follow. 👉 After a few weeks of practice, teams typically complete layout up to 4× faster than the traditional way. 👉 Accuracy? Still locked at ⅛ inch, even for the most complex framing or drywall conditions. Across the U.S., LightYX has already completed millions of square feet of layout for drywall and MEP trades. ➡️ Do you want to use it on your next project? Learn more here : https://www.lightyx.com/ #ConstructionTech #Drywall #LaserLayout #LightYX #BuildFastBuildRight #roboticlayout #contructionrobots #contructionlayout
- LINKEDIN · IMAGERecorded 25 Sept 2026
🚧 Starting a new construction project? What if you could finish layout in one day instead of one week? This photo shows how crews are using laser-guided layout to: ✅ Project full-scale drawings directly on site ✅ Mark walls, openings, and MEP points in minutes ✅ Eliminate guesswork and rework ✅ Hit the ground running — from day one This isn’t the future. It’s happening right now on job sites across the U.S. 🔹 Cut days off your schedule 🔹 Achieve 1/8″ accuracy 🔹 Get to work faster Want to see it in action on your site? Let’s talk. Learn more: https://lnkd.in/dpqTAu6Z #ConstructionTech #FieldLayout #LaserLayout #DrywallLayout #MEPLayout #StartStrong #LightYX #DigitalLayout #LayoutAutomation
6 of 105 adsSign up to see every LIGHTYX ad, filter by format and date, and get alerts on new ones.
See all 105 adsOn Facebook and Instagram
Facebook page LIGHTYX · 13 active ads, checked 5 Nov 2026 · 13 recorded
- All 13
- Image 9
- Video 4
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. LIGHTYX recently supported Sachse Construction on the new Museum of Illusions project in Sacramento, completing the framing layout and a floor scan across approximately 10,000 sq. ft. The project included 1,600 linear feet of layout, with angled walls and unique room shapes that required high precision to protect the architectural design. Using LightYX, the team established shared control lines, verified existing floor conditions, and projected the wall layout directly from the digital plans onto the construction floor. The result: Estimated traditional layout time: 4 days LightYX layout time: 6 hours A faster and more accurate field workflow—helping the framing and MEP teams move forward with confidence. Thank you to the Sachse Construction team for continuing to trust LightYX on your projects.
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. Laser-guided Layout for HVAC and Ductwork Professionals 🎯 In the world of HVAC, a few inches of deviance in the ductwork layout can lead to a nightmare of clashes and rework. That’s why LightYX laser-guided layout is the right choice for modern contractors. By projecting digital drawing models directly onto the ceilings, we’re changing the game: Eliminating human error: No more manual tape measure mistakes or misread plans. Boosting speed: Layout happens in a fraction of the time compared to traditional methods. Perfect Coordination: See exactly where hangers, sleeves, and duct runs go before hardware even touches the site. The "Paper-to-Field" gap is closing. We are no longer just reading plans; we are walking through them. Ready to bring precision to your job site? Click "Learn More" to see how LightYX is streamlining the trades. 🚀 #lightyx #hvac #constructiontech #bim #digitalconstruction #mechanicalengineering #vdc #construction
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. 38,000 SQF. Under 3 days. 5X faster. ⚡️ We’re redefining "fast" on this @dprconstruction project. Using @lightyx_layout to project complex curved framing directly onto the slab, we’ve ditched the manual tape measures and cranked up the productivity. When the layout is this precise, the rest of the build just flows. 🌊 #constructiontech #LightYX #dprconstruction #layoutdesign #bim #VDC #jobsitelife #innovation #framing #lasertech #builtsmart
Video previewMETA · VIDEOSince 19 Oct 2026Active on Facebook, Instagram, Threads. Installing new HVAC systems in an existing office means working around what’s already there. Getting the layout right is where it starts. Watch the ACCO Engineered Systems crew use LIGHTYX to lay out VAV box positions and ventilation opening locations as they prepare to install new ductwork alongside existing infrastructure. LightYX projects the digital layout directly onto the floor, so the crew can mark installation locations and check them against site conditions before the work moves overhead. Digital plans. Visible on site. Ready for the crew to put to work. Planning an HVAC retrofit or office renovation? #lightyx #hvac #mep #constructiontechnology
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. Two drywall pros. Just a few hours of training. Already running layout with LightYX on their own. That’s how intuitive it is — see it, build it. ✅ Clear, bright laser projection that crews can follow easily ✅ Up to 4× faster layout after just a few weeks of use ✅ 1/8 inch precision — even on complex framing jobs 💡 LightYX has helped layout millions of square feet for drywall and MEP teams across the U.S. 📌 Want to try it on your next project? 👉 Learn more: https://www.lightyx.com #LightYX #ConstructionTech #DrywallLayout #LaserLayout #BuildFaster #DigitalConstruction #MEPLayout #DrywallPro #ConstructionInnovation #JobsiteTech
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. Two drywall pros. Just a few hours of training. Already running layout with LightYX on their own. That’s how intuitive it is — see it, build it. ✅ Clear, bright laser projection that crews can follow easily ✅ Up to 4× faster layout after just a few weeks of use ✅ 1/8 inch precision — even on complex framing jobs 💡 LightYX has helped layout millions of square feet for drywall and MEP teams across the U.S. 📌 Want to try it on your next project? 👉 Learn more: https://www.lightyx.com #LightYX #ConstructionTech #DrywallLayout #LaserLayout #BuildFaster #DigitalConstruction #MEPLayout #DrywallPro #ConstructionInnovation #JobsiteTech
Show 7 more Meta ads
Video previewMETA · VIDEOSince 19 Oct 2026Active on Facebook, Instagram, Threads. Framing Layout – 400 SQFT in One Shot 🚀 With LightYX, your layout is projected directly on the jobsite surface — no chalk lines, no tape measures, no rework. This video shows 400+ SQFT of drywall layout projected in one go 🔥 💡 The projection might seem more flickering than it actually is — the camera exaggerates it due to frame rate. 👇 Build faster. Build smarter. #ConstructionTech #LaserLayout #DigitalConstruction #LayoutAutomation #JobsiteTech #DrywallConstruction #FieldProductivity #ConstructionRobotics #BIMtoField #3DScanning
Video previewMETA · VIDEOSince 19 Oct 2026Active on Facebook, Instagram, Threads. What if layout could move this fast? This timelapse was filmed from the top of a LightYX system while the crew followed the full-scale laser projection directly on the jobsite. No device in the shot — just the work getting done. Of course, the video is sped up… but the productivity improvement is very real. It’s interesting to watch how quickly the crew can move when the layout information is already projected exactly where they need it. For those doing layout in the field: what slows you down the most today — measuring, marking, moving control points, reading plans, or something else? Curious to hear what contractors are seeing on their projects.
META · IMAGESince 19 Oct 2026Active on Facebook, Instagram, Threads. Stop wasting hours with chalk lines, tape measures, and "good enough" manual layouts. We’re hitting the ceiling with laser projected layout that don't just show you where the tracks go—they guarantee accuracy to the millimeter. Fast: Install tracks in a fraction of the time. Accurate: No human error, no rework. Efficient: One person can manage what used to take a crew. The industry is moving. If you’re still doing it the old-school way, you’re wasting time, labor, and profit. Get with the tech or get left behind. 🛠️⚡ #constructionteam #drywalllife #framing #laserlayout #constructionefficiency #innovationonsite
META · IMAGESince 18 Oct 2026Active on Facebook, Instagram. Taking the guesswork out of MEP coordination! 🏗️✨ This is what it looks like when you bring the digital model directly to the slab. True BIM-to-Field solutions take the exact ductwork layout and project it right where it needs to be built. 💡 By projecting the layout directly onto the ceiling, we eliminate the need for tape measures, string lines, and the inevitable rework that follows manual layout. 📉 This is exactly how field teams are accelerating their workflows and driving precision with LightYX. 🚀 #ConTech #BIMtoField #MEP #LightYX #ConstructionInnovation
Video previewMETA · VIDEOSince 18 Oct 2026Active on Facebook, Instagram. What if layout could move this fast? This timelapse was filmed from the top of a LightYX system while the crew followed the full-scale laser projection directly on the jobsite. No device in the shot — just the work getting done. Of course, the video is sped up… but the productivity improvement is very real. It’s interesting to watch how quickly the crew can move when the layout information is already projected exactly where they need it. For those doing layout in the field: what slows you down the most today — measuring, marking, moving control points, reading plans, or something else? Curious to hear what contractors are seeing on their projects.
META · IMAGESince 18 Oct 2026Active on Facebook, Instagram. Laser-guided Layout for HVAC and Ductwork Professionals 🎯 In the world of HVAC, a few inches of deviance in the ductwork layout can lead to a nightmare of clashes and rework. That’s why LightYX laser-guided layout is the right choice for modern contractors. By projecting digital drawing models directly onto the ceilings, we’re changing the game: Eliminating human error: No more manual tape measure mistakes or misread plans. Boosting speed: Layout happens in a fraction of the time compared to traditional methods. Perfect Coordination: See exactly where hangers, sleeves, and duct runs go before hardware even touches the site. The "Paper-to-Field" gap is closing. We are no longer just reading plans; we are walking through them. Ready to bring precision to your job site? Click "Learn More" to see how LightYX is streamlining the trades. 🚀 #lightyx #hvac #constructiontech #bim #digitalconstruction #mechanicalengineering #vdc #construction
META · IMAGESince 18 Oct 2026Active on Facebook, Instagram. 38,000 SQF. Under 3 days. 5X faster. ⚡️ We’re redefining "fast" on this @dprconstruction project. Using @lightyx_layout to project complex curved framing directly onto the slab, we’ve ditched the manual tape measures and cranked up the productivity. When the layout is this precise, the rest of the build just flows. 🌊 #constructiontech #LightYX #dprconstruction #layoutdesign #bim #VDC #jobsitelife #innovation #framing #lasertech #builtsmart
Questions about LIGHTYX’s ads
Is LIGHTYX running LinkedIn ads?
We recorded no live LinkedIn ads for LIGHTYX on 9 Nov 2026.
How many LinkedIn ads has LIGHTYX run?
LinkedIn’s ad library lists 105 ads for LIGHTYX. We recorded 105 LinkedIn ads for LIGHTYX, first recorded on 25 Sept 2026 and last recorded on 12 Oct 2026.
Does LIGHTYX advertise on Facebook and Instagram?
Yes. LIGHTYX’s Facebook page had 13 active ads in Meta’s Ad Library, last recorded on 5 Nov 2026.
Does LIGHTYX run Google ads?
Yes. We recorded 14 Google ads for the domain lightyx.com on 2 Nov 2026.
Which ad formats does LIGHTYX use?
The 6 LinkedIn ads on this page include 4 image ads and 2 video ads.
Watch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.