0 new LinkedIn ads in 30 days · 3 of 3 networks checked
Keentel Engineering ads
- keentelengineering.com
- Engineering Services
- US
- 9 employees
Keentel Engineering’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to browse our full recording. Watch Keentel Engineering on any plan to get each new one in your feed.
Watchlist included in every plan
What Keentel Engineering runs
- Single image · LinkedIn
- 5
- Video · LinkedIn
- 1
| Network | Status | Last 30 days | Total ads found | Ad activity | Checked | Next step |
|---|---|---|---|---|---|---|
| None recorded | 0 | 43+ | 11/10/2026 | View ads → | ||
| Meta | None recorded | — | — | 10/22/2026 | View ads → | |
| None recorded | — | — | 11/01/2026 | View ads → |
Keentel Engineering has no new LinkedIn ads in the last 30 days. Its Facebook page had no active ads on 22 Oct 2026, and we recorded no Google ads on 1 Nov 2026.
Latest ads
- LINKEDIN · IMAGERecorded 8 Oct 2026
±1 microsecond. At 60 Hz that is 0.0216° of phase. One millisecond is 21.6°. PRC-028-1 and IEEE 2800-2022 both hinge on time-synchronized records. Most plants we assess have the recording hardware. Far fewer can prove their timestamps trace to UTC. The detail that catches sites out: modulated IRIG-B is good to tens of microseconds. Unmodulated IRIG-B is microsecond-class. On a drawing they look the same. Keentel Engineering — SCADA, protection and control for utility-scale solar, wind and storage, including PRC-028-1 and IEEE 2800-2022 compliance. → Full technical briefing on the Keentel blog https://lnkd.in/eYZKNMYS → We walk through it on our new YouTube channel — subscribe for IBR compliance engineering https://lnkd.in/enu7SJSX #IBR #PRC028 #IEEE2800 #SCADA #ProtectionAndControl #NERCCompliance
- LINKEDIN · VIDEORecorded 8 Oct 2026
Engineering with purpose. Built on trust. Driven by excellence. Hear our vision, values, and people behind Keentel Engineering Services. 🎥 Watch our story. #KeentelEngineeringServices #Engineering #Leadership #Innovation
- LINKEDIN · IMAGERecorded 8 Oct 2026
Why commissioning is where ERCOT projects win or lose their schedule. Getting through the ERCOT interconnection queue is only half the job. The path from mechanical completion to commercial operation depends on a tightly coordinated commissioning process — including the ERCOT New Generator Commissioning Checklist and its Part 1, 2, and 3 approvals. Small gaps in telemetry, ESI IDs, testing schedules, or coordination with ERCOT, the TSP, and QSE can quickly become major schedule delays. At Keentel Engineering, we help owners and EPCs manage the entire ERCOT commissioning process — from Commissioning Plan through field testing and final approval. 📖 Read the full breakdown: https://lnkd.in/ejcAK9mi 🎥 Follow our new YouTube channel for more ERCOT and power engineering insights: https://lnkd.in/ec8weBbT #ERCOT #BESS #EnergyStorage #PowerEngineering #Commissioning #GridInterconnection #TexasEnerg
- LINKEDIN · IMAGERecorded 24 Sept 2026
⚡ ERCOT Modeling Is Changing. Are You Ready? PGRR144, PSS®E Version 36, and Batch Zero are reshaping ERCOT load and generation modeling. Keentel Engineering’s latest technical guide explains what developers, utilities, and engineering teams need to know for the 2025–2026 transition. 📖 Read the blog: https://lnkd.in/eYis34PZ 🎥 Watch our YouTube video: https://lnkd.in/e8qcmXpE Need ERCOT support? Keentel Engineering provides PSS®E, PSCAD/EMT, dynamic modeling, interconnection studies, and ERCOT compliance support. #ERCOT #PGRR144 #PSSE #BatchZero #PowerSystems #KeentelEngineering
- LINKEDIN · IMAGERecorded 24 Sept 2026
⚡ ERCOT Modeling Requirements Are Changing. Are You Ready? PGRR144, PSS®E v36, and Batch Zero are reshaping how large loads and generation projects are modeled and studied in ERCOT. Keentel Engineering supports data centers, BESS, renewable generation, and large-load projects with ERCOT interconnection and power system modeling. 📖 Read our latest guide: https://lnkd.in/eYis34PZ 🎥 Visit our newly launched YouTube channel: https://lnkd.in/ec8weBbT #ERCOT #PGRR144 #PSSE #BatchZero #DataCenters #BESS #GridInterconnection #KeentelEngineeringHow are you today? Tell us what you want to hear from us. If you want to stay up-to-date with us, follow our page.
- LINKEDIN · IMAGERecorded 24 Sept 2026
⚡ The Grid Is Coming for Your Data Center NERC says roughly 75% of data center load models are insufficient to represent actual dynamic behavior. With major requirements approaching December 31, 2026, data center owners and operators need to be prepared. 👉 Read our latest Keentel Engineering blog: https://lnkd.in/eTmWMBpY 🎥 And subscribe to our new Keentel Engineering YouTube channel for practical content on data centers, grid interconnection, power system studies, and NERC compliance: #DataCenters #NERC #GridReliability #PowerSystems #KeentelEngineering
6 of 43+ adsSign up to see every Keentel Engineering ad, filter by format and date, and get alerts on new ones.
See all 43+ adsQuestions about Keentel Engineering’s ads
Does Keentel Engineering have new LinkedIn ads?
We found no new LinkedIn ads for Keentel Engineering in the 30 days to 11 Nov 2026.
How many LinkedIn ads has Keentel Engineering run?
LinkedIn’s ad library lists 43 ads for Keentel Engineering. We recorded 43 LinkedIn ads for Keentel Engineering, first recorded on 24 Sept 2026 and last recorded on 8 Oct 2026.
Does Keentel Engineering advertise on Facebook and Instagram?
Keentel Engineering’s Facebook page had no active ads in Meta’s Ad Library, last recorded on 22 Oct 2026.
Does Keentel Engineering run Google ads?
We recorded no Google ads for the domain keentelengineering.com on 1 Nov 2026.
Which ad formats does Keentel Engineering use?
The 6 LinkedIn ads on this page include 5 image ads and 1 video ad.
Watch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.