On air · 1 of 3 networks
EdgeEnergy™
- edgeenergyev.com
- Climate & Energy
- US
- 6 employees
EdgeEnergy™’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 65. Watch EdgeEnergy™ with Starter to get each new one in your feed.
Watchlist with Starter · $49/mo
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksOct 2026 | Checked | Next step |
|---|---|---|---|---|---|
| Running | 65 | Checked 28 Oct 2026 | See all 65 ads → | ||
| Meta | Not checked | — | |||
| None recorded | 0 | No ads found on the Google Ads Transparency Center | Checked 28 Oct 2026 | Collect them with the API → |
EdgeEnergy™ has 65 live LinkedIn ads. We recorded no Google ads on 28 Oct 2026.
Latest ads
- LINKEDIN · IMAGERecorded 17 Sept 2026
Your hardware is ready, but too many projects stall when hosts hear “three-phase upgrades.” EdgeEV™ feeds up to 150 kW DC fast charging from single-phase service, which is already present at most commercial locations. That means more of the projects in your pipeline become real installs instead of long-shot infrastructure bets. Help your partners say “yes” more often with a power solution that fits existing sites.
- LINKEDIN · IMAGERecorded 17 Sept 2026
Your vehicles do not live at perfect three-phase interconnect points. They live at yards, job sites and depots that often only have single-phase service. EdgeEV™ lets you install DC fast charging at those real-world locations, with install times measured in weeks and material savings on total project cost. More sites are viable, so more of your fleet can charge where it sleeps. No need to move trucks to some far-off “ideal” power location.
- LINKEDIN · IMAGERecorded 17 Sept 2026
Many depots and yards sit on single-phase service. Upgrading to three-phase means months of delay, six-figure costs, and potentially stranded assets. EdgeEV™ delivers up to 150 kW DC fast charging from that existing single-phase, so you can get trucks and equipment plugged in much faster and cheaper. One real fleet site went live in under 90 days with the same footprint and speed, zero three-phase. Keep your roll-out tied to operations, not utility timelines.
- LINKEDIN · IMAGERecorded 17 Sept 2026
Some of your best commercial and fleet locations sit on single-phase service. EdgeEV™ turns those underpowered sites into full-speed DC fast charging locations, often in a few weeks instead of long, drawn-out upgrade projects. Total project cost drops, and suddenly the business case clears the bar. Grow your network by saying “yes” to the sites everyone else has to walk away from.
- LINKEDIN · IMAGERecorded 17 Sept 2026
Most “nice to have” sites die when they hit the three-phase check box. EdgeEV™ makes those locations viable by using existing single-phase and cutting install time by up to 70%, with 25–50% lower total cost. The result is a much larger pool of sites that actually get built, not just modeled.
- LINKEDIN · IMAGERecorded 17 Sept 2026
Most of your service area does not have three-phase. That used to be a deal breaker. With EdgeEV™, single-phase service is enough to make more than 80% of sites viable for DC fast charging. Install time is much faster and total cost is lower, so you can light up more co-op territory with fewer stalled projects. Use it at co-op offices, member businesses and key community hubs instead of waiting years for upgrades.
6 of 65 adsSign up to see every EdgeEnergy™ ad, filter by format and date, and get alerts on new ones.
See all 65 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.