On air · 1 of 3 networks
Connected
- connectedglobal.com
- Real Estate & PropTech
- AU
- 92 employees
Connected’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 68. Watch Connected with Starter to get each new one in your feed.
Watchlist with Starter · $49/mo
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksOct 2026 | Checked | Next step |
|---|---|---|---|---|---|
| Running | 63 | Checked 30 Oct 2026 | See all 68 ads → | ||
| Meta | Not checked | — | |||
| None recorded | 0 | No ads found on the Google Ads Transparency Center | Checked 16 Oct 2026 | Collect them with the API → |
Connected has 63 live LinkedIn ads. We recorded no Google ads on 16 Oct 2026.
Latest ads
- LINKEDIN · CAROUSELSince 12 Jun 2026
The developers who win the GLP-1 capacity race won't be the ones who break ground first. They'll be the ones whose facilities clear FDA validation fastest. Validation is a construction decision. Traditional IQ/OQ/PQ was built for stick-built facilities where construction and validation never formally meet. See how the ASTM E2500 FAT/SAT bridge, engineered at FEL-3, can compress your commercial-release timeline by around 20%.
- LINKEDIN · IMAGESince 12 Jun 2026
370%+ duties on aluminum. UFLPA port detentions. A 17-foot transport height that won't clear standard US overpasses. How trans-Pacific modular components are quietly blowing pharmaceutical CapEx budgets before they even reach the site. For a $100M+ facility, assuming your Chinese modular supplier is using stainless steel - when they actually substituted extruded aluminum - can trigger an 8-figure Anti-Dumping/Countervailing Duty penalty. Combine that with unbudgeted SPMT transport costs and compounding FDA validation delays, and your schedule certainty vanishes. Here is the exact compliance and logistics mitigation matrix we use on every trans-Pacific build to protect the baseline budget.
- LINKEDIN · IMAGESince 25 Feb 2026
Equal space division produces coexistence. Belonging requires something harder. When three distinct organisational cultures are forced under one roof, the instinct is to split the floor plate and call it resolved. It rarely is. The full thinking is in our latest article: https://lnkd.in/gcKUNwZf - worth a read if you're navigating a consolidation, a multi-tenant build, or a handover date that already feels under threat. #Connected #WorkplaceStrategy #CorporateRealEstate #IntegratedDelivery #ConstructionManagement #FutureOfWork
- LINKEDIN · IMAGESince 23 Feb 2026
Fast-tracking a pharmaceutical upgrade in a live facility is one of the hardest challenges in construction. You are balancing three competing forces: 1. The immovable deadline (to hit market demand). 2. The complex integration (connecting old infrastructure with new). 3. The absolute requirement for zero operational impact. Most projects compromise on one. We don't. At Connected, our methodology is built for the "Brownfield Reality." We don't just build; we de-risk the timeline. By front-loading the logistics strategy—like we did for MNAQ's complex campus integration—we remove the variables that cause delays. We manage the risk so you can focus on the science. If you are planning a complex integration in 2026, the time to plan the methodology is now. #ProjectDelivery #LifeSciences #RiskManagement #Connected #PharmaConstruction
- LINKEDIN · IMAGESince 23 Feb 2026
The most expensive part of a pharmaceutical upgrade isn't the steel or the cleanroom panels. It's the downtime. In high-yield manufacturing environments, every hour of stopped production impacts the bottom line. Yet, traditional construction schedules often treat "live operations" as an afterthought. We see a different reality. The success of a brownfield upgrade—whether it's connecting two facilities via a pipe bridge or retrofitting a processing suite—depends entirely on the methodology. It requires: 1. Precision sequencing (managing 60+ daily deliveries without disrupting intake). 2. "Invisible" construction zones (contamination control that exceeds PC2 standards). 3. A timeline that serves the yield target, not just the build. We recently delivered Australia's largest food safety campus under these exact constraints. Live testing never stopped. The yield never dropped. Innovation isn't just about the molecule. It's about how you build the space that makes it. #PharmaceuticalManufacturing #ConstructionInnovation #AdvancedManufacturing #LifeSciences #Connected
- LINKEDIN · IMAGERecorded 14 Sept 2026
The office isn't dead, but the old model is. We're seeing a shift to the "un-office"—built for hospitality, not hierarchy. Read the insights from JP Morgan Chase, Savills, and Cushman & Wakefield in our new report.
6 of 68 adsSign up to see every Connected ad, filter by format and date, and get alerts on new ones.
See all 68 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.