On air · 1 of 3 networks
Vemaventuri
- vemaventuri.io
- DE
- 19 employees
Vemaventuri’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 75. Watch Vemaventuri with Starter to get each new one in your feed.
Watchlist with Starter · $49/mo
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksOct 2026 | Checked | Next step |
|---|---|---|---|---|---|
| Running | 31 | Checked 30 Oct 2026 | See all 75 ads → | ||
| Meta | None recorded | 0 | No active ads recorded on the Meta Ad Library | Checked 28 Oct 2026 | Collect them with the API → |
| Recently | 13 | Ads on the Google Ads Transparency Center | Checked 14 Oct 2026 | Collect them with the API → |
Vemaventuri has 31 live LinkedIn ads. Its Facebook page had no active ads on 28 Oct 2026, and we recorded 13 Google ads on 14 Oct 2026.
Latest ads
- LINKEDIN · IMAGESince 28 Oct 2026
The wall is poured to the top, and the formwork looks exactly as planned. What happened inside only shows when the formwork comes off. Monitoring fill level and compaction during the pour finds voids while they can still be fixed. Curious how it works? https://lnkd.in/eaQAEz9f/?utm_campaign=RealityCheckFocusMarkets&utm_source=linkedin&utm_medium=paid&utm_id=1215282254&hsa_acc=512434250&hsa_cam=1215282254&hsa_grp=905900264&hsa_ad=1617534264&hsa_net=linkedin&hsa_ver=3 #ConcreteRealityCheck #KnowingNotGuessing #PHONO
- LINKEDIN · IMAGESince 21 Oct 2026
Every wall is designed for a pour rate. On site, trucks bunch up and the pump speeds up. The pressure follows, and from the outside you can't see it, and you rarely hear it. Measuring formwork pressure live shows the margin while there's still time to slow down. Curious how it works? https://lnkd.in/e9Kn38ff/?utm_campaign=RealityCheckFocusMarkets&utm_source=linkedin&utm_medium=paid&utm_id=1215282254&hsa_acc=512434250&hsa_cam=1215282254&hsa_grp=903989764&hsa_ad=1605796934&hsa_net=linkedin&hsa_ver=3 #ConcreteRealityCheck #KnowingNotGuessing #PREMO
- LINKEDIN · IMAGESince 15 Oct 2026
The mix is right on paper. 10 % more water turns a w/c ratio of 0.50 into 0.55. On an 8 m³ truck, that's about a full bathtub, and the concrete looks exactly the same. Concrete strength: -10%. Measure the w/c ratio on site in 2 minutes! Curious how it works? https://lnkd.in/eyjBzvt5/?utm_campaign=RealityCheckFocusMarkets&utm_source=linkedin&utm_medium=paid&utm_id=1215282254&hsa_acc=512434250&hsa_cam=1215282254&hsa_grp=903277444&hsa_ad=1595923464&hsa_net=linkedin&hsa_ver=3 #ConcreteRealityCheck #KnowingNotGuessing #SONOHub
- LINKEDIN · IMAGESince 10 Oct 2026
Formwork comes off on day 3. That's the plan. But concrete gains strength with temperature, not with the calendar, and one cold night is enough to shift everything behind it. Measuring the concrete temperature shows whether day 3 is still day 3. Curious how it works? https://lnkd.in/enY6nP-k/?utm_campaign=RealityCheckFocusMarkets&utm_source=linkedin&utm_medium=paid&utm_id=1215282254&hsa_acc=512434250&hsa_cam=1215282254&hsa_grp=901348464&hsa_ad=1589145194&hsa_net=linkedin&hsa_ver=3 #ConcreteRealityCheck #KnowingNotGuessing #TEMO
- LINKEDIN · IMAGESince 16 Sept 2026
Engineers and architects, take note! What you design today will be checked against the new Eurocode 2. By March 2028, conflicting standards will have been withdrawn. The new design checks depend on values that aren't produced at a desk, but during the pour. How warm the element got. How much water was in the mix. If you don't write monitoring into the tender specifications, it won't happen on site. And if something goes wrong later, you'll be the first one asked. Download the white paper now: "The 3 Points Where 2nd Generation Eurocode 2 Depends on What Happens on Site"
- LINKEDIN · IMAGESince 15 Sept 2026
CEOs, Leading positions and Owners in construction, take note! 🏗️ Tired of costly downtime throwing your projects off schedule? You’re not alone – delays from unchecked concrete conditions can drain budgets fast. There are ways to monitor your site in real time and prevent these expensive setbacks. Download our free guide: 5 Proven Strategies to Eliminate Costly Downtime and Keep Your Construction Projects On Schedule.
6 of 75 adsSign up to see every Vemaventuri ad, filter by format and date, and get alerts on new ones.
See all 75 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.