Not on air · 3 of 3 networks checked
Santé Group
- sante-group.com
- Renewable Energy Power Generation
- AU
- 142 employees
Santé Group’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 20. Watch Santé Group on any plan to get each new one in your feed.
Watchlist included in every plan
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksNov 2026 | Checked | Next step |
|---|---|---|---|---|---|
| None recorded | 0 | Checked 3 Nov 2026 | See all 20 ads → | ||
| Meta | None recorded | 0 | No active ads recorded on the Meta Ad Library | Checked 25 Oct 2026 | Collect them with the API → |
| None recorded | 0 | No ads found on the Google Ads Transparency Center | Checked 9 Oct 2026 | Collect them with the API → |
Santé Group has no live LinkedIn ads. Its Facebook page had no active ads on 25 Oct 2026, and we recorded no Google ads on 9 Oct 2026.
Latest ads
- LINKEDIN · IMAGESince 21 Aug 2026
Who places the purchase order decides what your equipment costs. Buy the major equipment direct from the OEM. The 5 to 7% contractor margin stays with you. In Texas, up to 8.25% in sales tax can too. We install, commission and test. Your only role is the purchase order.
- LINKEDIN · IMAGESince 21 Aug 2026
160 weeks. That's the current US queue for large power transformers and high-voltage switchgear. Wait for final drawings before ordering, and a 2028 energization date has already left the station. That's not an argument to rush design. It's an argument to separate procurement from it. We lock Tier 1 long-lead equipment at Day Zero, so the grid connection stays off the critical path. Ask us when we'd place your order. The answer is a date, not a phase.
- LINKEDIN · IMAGESince 21 Aug 2026
In an energy-only market there are no capacity payments. The plant earns when it dispatches, not a day before. So a COD slip doesn't show up on the schedule. It shows up in year one revenue, and in a summer window you don't get back. That's not an argument to build faster. It's an argument to schedule around the grid's calendar: study milestones, telemetry readiness, energization gates. Schedule certainty is revenue certainty.
- LINKEDIN · IMAGESince 21 Aug 2026
There's a line in every EPC bid worth a second look: the contingency. 10 to 15% is standard, and it reads like protection. It isn't. It's your equity return, parked in someone else's price. A guaranteed maximum price, with grid and supply chain risk held by the builder, takes it out of the model entirely. The board sees a final number, not a starting point.
- LINKEDIN · IMAGESince 21 Aug 2026
Most fixed-price solar bids look complete until the exclusions page. That's where the substation goes. And the 138 kV tie-line. And the grid delay risk. Moved quietly to your side of the table. The price didn't get sharper. The scope got smaller. We price it the other way: one contract, one guaranteed maximum price, grid scope inside it. If your bid comes with a carve-out list, twenty minutes with us will tell you what it's really worth.
- LINKEDIN · IMAGERecorded 12 Oct 2026
Some workforce villages are better owned than rented. We design, build and later remove them, and you keep the right to change operator.
6 of 20 adsSign up to see every Santé Group ad, filter by format and date, and get alerts on new ones.
See all 20 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.