Not on air · 2 of 3 networks checked
Pelico
- pelico.ai
- Software Development
- US
- 207 employees
Pelico’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 454. Watch Pelico with Starter to get each new one in your feed.
Watchlist with Starter · $49/mo
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksNov 2026 | Checked | Next step |
|---|---|---|---|---|---|
| None recorded | 0 | Checked 3 Nov 2026 | See all 454 ads → | ||
| Meta | Not checked | — | |||
| Recently | 7 | Ads on the Google Ads Transparency Center | Checked 6 Oct 2026 | Collect them with the API → |
Pelico has no live LinkedIn ads. We recorded 7 Google ads on 6 Oct 2026.
Latest ads
- LINKEDIN · VIDEOSince 27 Oct 2026
37% of revenue was blocked by parts shortages at Safran Transmission Systems. The business was growing 25% a year, while the operations team spent 70% of its bandwidth piecing together data across six tools. So the team rebuilt its daily routine, and a check that took two hours now takes ten minutes. Within four months, part shortages were down 88%. And the revenue that used to sit blocked in the shop now leaves it, with customer OTD up 15%.
- LINKEDIN · VIDEOSince 27 Oct 2026
Explore how Safran Transmission Systems optimized their factory operations in a context of ramp-up and saw an 88% reduction in parts shortages in less than 4 months.
- LINKEDIN · VIDEOSince 23 Oct 2026
Watch how Pelico turned a skeptic into its strongest internal champion. This is Mike's story.
- LINKEDIN · IMAGESince 23 Oct 2026
Most ops improvement projects stall on the same sentence: the data isn't ready. It never is. ERP, MES, PLM and supplier records on a long-cycle aircraft program were built for different jobs by different teams over different decades. The data won't be ready until after the aircraft is. Pelico sits on top of the stack and reads those systems as they are. No rip-and-replace, no data lake prerequisite. Where records conflict, that surfaces as a visible gap your team can act on, not a silent assumption buried in a plan. Read-access to existing systems. No new master data program. 12 weeks to live.
- LINKEDIN · IMAGESince 21 Oct 2026
Supply is chasing a compressor. Production is building the unit with parts. Sales is promising the one without. Record backlogs expose this fast: every team optimizes its own corner, and the plant is busy everywhere except where it counts. Three teams, three priorities, one compressor. By the time it reaches the weekly review, the promise has already been made. In data centers, the customer does not wait for your teams to agree. It re-sources.
- LINKEDIN · SPOTLIGHTSince 21 Oct 2026
Pelico keeps execution aligned with what is happening on the floor.
6 of 454 adsSign up to see every Pelico ad, filter by format and date, and get alerts on new ones.
See all 454 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.