On air · 1 of 3 networks
Applied Digital
- applieddigital.com
- US
- 275 employees
Applied Digital’s ads on LinkedIn, Meta and Google, recorded by adsrunning. Browse the latest here for free. Sign up free to see all 36. Watch Applied Digital with Starter to get each new one in your feed.
Watchlist with Starter · $49/mo
| Network | Status | Live ads | Nov 2025LinkedIn activity · 52 weeksNov 2026 | Checked | Next step |
|---|---|---|---|---|---|
| Running | 33 | Checked 30 Oct 2026 | See all 36 ads → | ||
| Meta | Not checked | — | |||
| None recorded | 0 | No ads found on the Google Ads Transparency Center | Checked 4 Oct 2026 | Collect them with the API → |
Applied Digital has 33 live LinkedIn ads. We recorded no Google ads on 4 Oct 2026.
Latest ads
- LINKEDIN · JOBSince 19 Apr 2025
- LINKEDIN · FOLLOWRecorded 7 Oct 2026
Get the latest jobs and industry news
- LINKEDIN · IMAGERecorded 28 Oct 2026
Have some downtime this weekend? Check out Behind the Build. I’m proud of the teams bringing Applied Digital’s AI campuses to life, and this series shares their stories. Six episodes are out now: 1. The Builders — Delivering a campus against tight deadlines. 2. The Townhall — Answering community questions and earning trust. 3. The Space Between Design & Delivery — Turning evolving designs into reality. 4. Inside the Loop — Cooling AI infrastructure while minimizing water use. 5. Power Demand — Following electricity from the utility to the AI systems. 6. The Responsibility of Reliability — Preparing the teams and systems that keep it all running. Watch here: https://lnkd.in/gGS-GWb4 #BehindTheBuild #AppliedDigital #AIInfrastructure
- LINKEDIN · VIDEORecorded 20 Oct 2026
Building an AI data center is only the beginning. Keeping it reliable is the responsibility that follows. In Episode 6 of Behind the Build: The Responsibility of Reliability, Brent Lundstrom, CFM, Campus Director of Operations at Applied Digital, shares what it takes to prepare Polaris Forge 2 in Harwood, North Dakota, for long-term success. From backup power and redundant systems to the people responsible for mission-critical operations, this episode explores how reliability is built into every aspect of a modern AI data center. 🎥 Watch the full episode: https://lnkd.in/gAheS_J2 #AppliedDigital #AIInfrastructure #DataCenters #ArtificialIntelligence
- LINKEDIN · ARTICLERecorded 15 Oct 2026
What does it actually take to build AI infrastructure at this scale? It takes more than land, power, and a plan. It takes teams that can apply lessons from one build to the next, adapt as customer requirements evolve, maintain safety and quality at speed, and build long-term relationships with communities. Our latest article takes a closer look at the first three episodes of Behind the Build and the people, processes, and problem-solving behind the progress at Polaris Forge 2. Because building at this scale isn’t about avoiding change. It’s about knowing how to keep moving when it happens. Read the full article below. #behindthebuild #applieddigital
- LINKEDIN · VIDEORecorded 7 Oct 2026
AI demands a lot of power. But having power available is only step one. Episode 5 of Behind the Build takes us back to Applied Digital's Polaris Forge 2 Campus to follow how power moves through an AI factory and reaches high-density compute. As compute evolves, the infrastructure behind it has to be designed to evolve too. See how Applied Digital and its partners are building a standardized power architecture designed for what comes next. Watch Episode 5: Power Demand → https://lnkd.in/guja26yx #BehindTheBuild #AIInfrastructure #DataCenters #PowerInfrastructure
6 of 36 adsSign up to see every Applied Digital ad, filter by format and date, and get alerts on new ones.
See all 36 adsWatch the companies you care about.
Filter every ad by industry, country, format and network, and get alerts when a company you watch starts running new ads.